Stay tuned for updates as my lumber kit is scheduled to be delivered on Friday! I will be down to the site again to watch them unload the kit and check up on any framing they begin. Here's to hoping for mild weather for another week or two so they can get the frame up, and the house enclosed. Cheers!
Pages
Wednesday, December 28, 2011
Stopped by worksite today
I stopped by the construction site today to see what progress has been made over the past week. Wow! The weeping tile, drainage, and utility connections are all in and the land is back filled.
I was a little concerned the ground was backfilled before the basement slab was poured, but everything seems fine; the walls don't seem to be bowing inward, and I can't see any cracks so it appears they were careful about the back filling. I've had friends of friends watch as their basement walls cracked while being back filled, so the fact that mine aren't cracked is good.
Stay tuned for updates as my lumber kit is scheduled to be delivered on Friday! I will be down to the site again to watch them unload the kit and check up on any framing they begin. Here's to hoping for mild weather for another week or two so they can get the frame up, and the house enclosed. Cheers!
Stay tuned for updates as my lumber kit is scheduled to be delivered on Friday! I will be down to the site again to watch them unload the kit and check up on any framing they begin. Here's to hoping for mild weather for another week or two so they can get the frame up, and the house enclosed. Cheers!
Monday, December 19, 2011
Forms Pulled
I drove by the house today to take a look at the foundation before they back fill. I was happy to see that they put on the Delta MS moisture membrane. From what I could see, things look good, there are some sections of concrete that have unusual texture, but no cracks. Hopefully the pour went well. This week is actually supposed to be warm, I can't wait to see the progress they make.
Saturday, December 17, 2011
Subscribe to:
Posts (Atom)